Hill Canyon WWTP

Hill Canyon WWTP

Application Solutions was contracted to provide a design that replaced the existing fuel treatment system and replaced two of three containerized Generator sets with one 630 kWe Generator Set within a building that had space for a second 630kWe generator set. Given...
BioSpark LLC / NBC Bucklin Point

BioSpark LLC / NBC Bucklin Point

Application Solutions was contracted to provide the design for a 660kWe Dual fuel (Natural Gas & Digester Gas CoGeneration unit for BioSpark’s NBC Bucklin Point Project. Application Solutions’ scope included design of the fuel gas treatment system...